.


Request Information
Request Sample Part


Metal Investment Casting

Shell Technology  

Tunnel

The continuous high-speed drying tunnel provides the opportunity for the whole production to be led through one drying line. The modular construction allows a perfect adaptation of the tunnel to the requirements of every investment casting company.

All trees are rotating continuously and move from one station to the other every 3 minutes.

The tunnel is available in different dimensions. In the biggest plant 60 shells with a weight up to 350 kg and a maximum size of 1 x 1 meter can be dried.

 



Drying tunnel with 6 straight, 2 90°-modules
and a chain conveyor



Tunnel entrance and exit
Sand separator in entrance module
Fixing of the tree

Download



 


 


Hot News